Now that the SP is finished work can begin on FF182, first it needs to be stripped to a bare shell and a transport frame made so that it can be delivered to the bodyshop for shotblasting.
Now that the SP is finished work can begin on FF182, first it needs to be stripped to a bare shell and a transport frame made so that it can be delivered to the bodyshop for shotblasting.